An aluminium formwork quotation is only as reliable as the drawings, scope and cycle plan supplied with the inquiry. Send coordinated architectural and structural plans, wall and slab dimensions, an opening schedule, typical-floor count and the delivery boundary. A supplier can estimate from floor area, but that estimate cannot establish the number of corner panels, fillers, ties, prop heads or custom opening pieces. For a firm comparison, ask each bidder to quote against the same drawing revision and to return an itemized panel schedule with assumptions and exclusions. State whether the scope includes walls, columns, beams, slabs, stairs and accessories. This guide lists nine files or schedules that make a building-project RFQ more useful. It also explains how to compare technical and commercial returns without mistaking an attractive per-square-metre number for a complete supply package.
On this page
Send nine items: project sheet, architectural plans, structural plans, wall elevations, opening schedule, floor-type matrix, pour sequence, accessory and support scope, and delivery instructions. Put a revision number and date on every drawing. Mark provisional dimensions so the supplier can state assumptions rather than silently filling gaps.
Project sheet: location, building use, number of towers and buyer contact.
Architectural plans: floor geometry, room layout, doors, windows and facade changes.
Structural plans: concrete wall and slab dimensions, beams, columns and reinforcement-sensitive zones.
Wall elevations: heights, offsets, openings and any changing wall thickness.
Opening schedule: each door, window, shaft and service penetration with dimensions in mm.
Floor-type matrix: typical floors, podiums, transfer levels and mirror-image units.
Pour sequence: work zones, number of concurrent sets and planned cycle order.
Scope sheet: walls, slabs, stairs, pins, wedges, ties, props, heads and spares.
Delivery sheet: destination, Incoterm, packing preference and target programme.
If some documents are not ready, identify them as pending and ask for a budget estimate with explicit assumptions. A supplier should not treat a preliminary plan as a fabrication release. Establish who in the project team will approve the final formwork layout and changes to structural dimensions.
The HSE temporary works FAQ places formwork among temporary works that need design and coordination. The RFQ package should support that process; an article or supplier quote cannot approve a construction method.
Send coordinated architectural and structural plans, wall elevations, sections at difficult junctions and an opening schedule. Dimension wall thickness, storey height and slab levels in mm. Include drawing revisions and a floor-type matrix so the supplier can distinguish repeated floors from exceptional levels before counting panels and accessories.
Quick answer: Use both architectural and structural drawings for the same revision. The architectural set locates rooms and openings; the structural set defines concrete dimensions and supporting conditions. Add wall elevations and sections at corners, beams, staircases and slab edges. A 2D layout can then resolve panel IDs and interfaces before prices are fixed.
The structural wall thickness determines the gap between opposing form faces. Storey height and slab level determine panel height and head details. A drawing that says only “typical floor” leaves unresolved whether every floor has the same balcony, shaft or opening arrangement. Attach a floor-by-floor repetition matrix with exceptions highlighted.
For each opening, show width, height, sill level and distance to the nearest wall end or corner in mm. This helps identify jamb and head pieces and checks whether a standard panel can fit nearby. Sections are especially valuable at beam drops, slab edges and door heads where a plan cannot show the complete junction.
If the building uses an early-stripping scheme, state which supports remain and which panels move to the next zone. Ask the bidder to identify the slab panel, prop head and prop quantities used in the schedule. Do not rely on a generic cycle-time claim: the site design, concrete strength and sequence control the actual programme.
Drawing or schedule | Main quotation effect | Check before approval |
|---|---|---|
Plans and elevations | Wall and panel geometry | Same revision and dimensions |
Opening schedule | Jamb, sill and head parts | All openings included |
Floor matrix | Reuse and set count | Exceptions separated |
Support plan | Props and heads | Matches slab and beam loads |
Pour sequence | Concurrent equipment | Enough sets for work fronts |
Compare quotes by a common bill of materials, not only by area rate. Count wall panels, slab panels, corner pieces, fillers, ties, pins, wedges, alignment parts, prop heads and props. Ask for unit weight, quantities and drawing IDs. A low panel-face price can exclude the hardware that makes the system usable.
Ask each supplier to return a layout drawing and panel schedule keyed to the RFQ revision. Check whether the drawings show inner and outer corners, returns and every opening. Review the number of custom fillers: many unique pieces can increase cost and complicate site sorting. A proposed substitution should be identified by panel ID and approved before fabrication.
Wall ties restrain concrete pressure between opposing form faces. The Concrete Society's form ties note explains that function. Tie quantities should be derived from the selected system and project design, not a simple rule per square metre. Pins and wedges connect panel edges; they do not replace ties.
The quotation should say what the supplier will deliver and what the contractor must provide. Clarify whether drawings, pre-assembly, packing labels, spares, replacement parts and after-sales technical support are included. If the design is to be checked by a project engineer, identify what technical data will be provided for that review.
For commercial comparison, normalize currency, Incoterm, payment stage and included freight. Ask each bidder for the same specification and quote date. A revised design should trigger a revised schedule and price, not an unexplained lump-sum change.
There is no reliable project price without a defined formed area and supply scope. A wall-panel-only rate differs from a complete wall, slab, prop and accessory package. Ask bidders to state whether the denominator is formed face area or floor area, then compare the itemized total under the same delivery term.
Quick answer: Require a packing list by panel ID and floor zone, with bundle dimensions and gross weight. Ask for a loading estimate based on the actual panel mix and destination. Before production, freeze the approved drawing revision and record any change in an amendment log. Match the shipment to the same revision on receipt.
Aluminium panels are often bulky relative to their weight, so a 40HQ container loading plan depends on panel sizes, bundle layout and mixed accessories. A generic “tons per container” figure cannot show whether every opening part and corner panel fits the shipment. Ask for the proposed number of containers, bundle labels and handling method for the actual project schedule.
Set a review path: supplier layout, project engineer comments, revised layout, buyer approval, fabrication, pre-shipment check and site receipt. The receiving team should be able to match an individual panel ID to the drawing and packing list. If a wall opening changes after approval, the change should identify affected panels, accessories, price and schedule.
Our team brings 17+ years of scaffolding manufacturing & exporting experience. In-house engineering support and project-based technical drawings can help define an itemized supply scope. One-stop supply from complete systems to single components may simplify a quote where formwork panels, props and accessories are purchased together.
See the formwork product range. Send the nine-item RFQ through the project inquiry page.
A supplier can make a budget estimate from floor area, but it will carry major assumptions. Floor area does not reveal corners, openings, wall heights, support needs or custom fillers. For a comparable project quotation, request a drawing-based panel layout and an itemized schedule tied to the same plan revision.
Check the drawing revision, panel IDs, quantities, exclusions, tie and prop schedule, finish, packing and delivery term. Confirm that every opening and exceptional floor is represented. Ask the project engineer to review the technical layout and support information before issuing a purchase order based on the commercial return.
Send the plans, elevations, floor matrix and scope sheet for an itemized quotation. Email mason@easy--scaffolding.com | WhatsApp +86 13212036031 | https://www.easy-scaffolding.com/